High-Pressure Polyurethane (PU) Injection Grouting, Polyurethane-based Waterproofing Membrane @ Sturdee Road
30 Sturdee Road1
30 Sturdee Road2
30 Sturdee Road3
30 Sturdee Road4
30 Sturdee Road5
30 Sturdee Road6
30 Sturdee Road7
Works Involved: High Pressure Polyurethane (PU) Injection Grouting to:
- Master bedroom toilet wall
- Floor joints
Clear Penetrative Waterproofing Membrane to:
- Floor tiles of Master bedroom toilet
SWC Construction was engaged by the client to: Carry out high-pressure polyurethane injection grouting to the outside of the Master bedroom toilet wall and floor joints of water leakage areas (L-shape) to stop water ingress. Apply two coats of Clear Penetrative Waterproofing solution to the floor files of the Master bedroom toilet. The client was facing water leakage due to wear off over the years.