High Pressure PU Injection Grouting @ Flora Road
PR - Flora Road 2
PR - Flora Road 3
Works involved:
High Pressure PU Injection Grouting to Wall and Floor Joints
SWC Construction was engaged by client to:
- Carry out high pressure PU injection grouting to the joints between wall and floor, surroundings of the floor trap to properly seal up cracks and joints to stop water seepage to the external wall
- Make good of damaged paint works with putty compound and close matching paint colour